Azerbaijan Rigs Azerbaijan Rigs
  • Home
  • News
  • Contact Us

AZ  UK

  1. You are here:  
  2. Home
  3. News
  4. The installation of 1st engine
Details
Category: News
By Ramil
Ramil
18.Mar
Hits: 30

The installation of 1st engine

The installation of 1st engine to new generation drilling rig has been completed.

Read next

  • Erection of Upper Hull Block
    Erection of Upper Hull Block
    29.Mar
Previous article: Erection of Upper Hull Block Prev

Most read

  • New 6th Generation Semi-submersible Drilling Rig Design
    New 6th Generation Semi-submersible Drilling Rig Design
    16.Jul
  • Erection of Upper Hull Block
    Erection of Upper Hull Block
    29.Mar
  • The installation of 1st engine
    The installation of 1st engine
    18.Mar
  • Factory Acceptance Test
    Factory Acceptance Test
    14.May

Blog category

  • News
Copyright © 2026 Azerbaijan Rigs. All Rights Reserved.